Our Campus

Visionary in both design and thinking, our 21st-century facilities and school campus break new ground for this part of the African continent.

Opening phases

Our opening phases are as follows >>>>

Phase 1 (2024)

Primary School, Aquatics Centre, Administration, Support and Medical Centre, Staff Accommodation.

Phase 2 (2026)

Middle School, NBA Basketball Stadium, Football Field, 400m track and Boarding Houses.

Phase 3 (2030)

High School, 800 seat Theatre and Performing Arts Centre, Central Library and Examinations Centre.

Phase 1 Interiors

Campus Entrance

Quad

Welcome Centre

Medical Centre

Music Room

STEM Rooms

Library

Art Rooms

Brooke Hall

Playground

Aquatic Centre

Basketball Court

Nigerian & African Studies Room

Indoor Gym

Staff Accommodation

Auditorium

Phase 2 Interiors

Middle School

Boarding Houses

400m Track

NBA Basketball Stadium

Phase 3 Interiors

High School

800-seat Theatre

Performing Arts Centre

Central Library

Entire campus images

Opened September 2024

For Year 1 to Year 6 (ages 5+ to 10+)

Drinking water will be available at fountains throughout the campus to ensure everyone stays hydrated.

The total area of the school site is more than 225,000 square metres

Campus facts

Opened September 2024

For Year 1 to Year 6 (ages 5+ to 10+)

Site dimensions

1km x 700m

There are 24,000 cubic metres of bricks and masonry in the buildings

Circumnavigation time

45 minutes

When the site is finished, there will be a walking / cycling track around the inside

We will have

What we aim to achieve in the nearest future:

A full-sized 400m outdoor athletics track

Our Primary School will boast specialist rooms such as STEM*, Science and Art

Our auditorium will be state-of-the-art, will seat 800 and will have all the associated spaces you would expect in a professional theatre.

An international consultancy team working on exciting playground zones

An NBA-standard basketball arena